HO CHI MINH METRO LINE 1 – PACKAGE CP 1B (UNDER CONSTRUCTION)
- 27
- 2019
- Client
- Ho Chi Minh City ‘s People Committee
- Design / Supervision
- Shimizu – Maeda
- Completion
- Brief Description
- Package 1B comprises the section from Opera House to Ba Son Shipyard, which is nearly 2 kilometers long and includes the construction of a four-level station to a depth of 40 meters at Opera House. Especially, this section is constructed with underground Shield Tunnel Boring Machine. The use of this machine helps to control sinking well, minimizing the impact on the environment and traffic, therefore contributing to speed up the progress.
- Location
- Ho Chi Minh City