ShimzVIETNAM

Bai Chay Bridge

  • 27
  • 2006
Client
No.18 Projects Management Unit, Ministry of Transport, Government of Vietnam
Design / Supervision
The Consortium of Japan Bridge & Structure Institute, Inc.
Pacific Consultant International
Transport Engineering Design Incorporation
Hyder Consulting - CDC Ltd."
Completion
Brief Description
[Main Bridge]
• 6-span Continous Single-cell Concrete Box Girder with Steel Pipe Internal Bracing
• Single RC Tower with Single-Plane Cable-stayed Bridge
• Length: 903m
• Main Span: 435m
• Width: 25.3m
• Pneumatic Caisson Foundations for Piers P2,P3 and P4
• Shin-do Pile Foundations for A1, P1, P5, P6

[Approach Bridge]
• Length: 99m
• Main Span: 40m
• Width: 25.7 ~ 30.3m
• 3-span Continous PPC Box Girder Bridge
Location
Quang Ninh Province, Socialist Republic of Vietnam