ShimzVIETNAM

Binh Bridge

  • 27
  • 2005
Client
Binh Bridge Project Management Unit (PMU – BINH)
Design / Supervision
Consortium of CHODAI and JOC in Association of FINNROAD & HECO
Completion
Brief Description
• Bridge Type: 17-span continous composite plate girder (3 spans of continous cable stayed bridge included)
• Bridge Length: 1,280m
• Spans: 50 + 6@60 +100+260+100+6@60+50m
• Effective Width: 22.5m (4-lane roadway + 2 sidewalks)
• Tower: H-shaped RC Tower, H =101.6m, 2nos.
• Construction Method: Incremental launching method in the approach spans, Cantilever method in the main spans of cable-stayed bridge.
• Land Preparation Work: 15,000m3
• Foundation Piling Work:D800 ~900mm, 231 nos, D2,000m, 58 nos.
• Pier: 14 nos. Abutment: 2nos.
Location
Hai Phong City, Socialist Republic of Vietnam