ShimzMEXICO

Techno State New Factory

  • San Luis Potosi
  • 2015
Client
Techno State, S.A. de C.V.
Design / Supervision
Shimizu Corporation
Completion
Brief Description
Structure: Steel Structure, Reinforced Concrete Structure
Total Floor Area: 2,280m2
Location
WTC Industrial, San Luis Potosi