Chiyoda Integre Mexico New Factory
- Guanajuato
- 2016
- Client
- Chiyoda Integre de Mexico S.A. de C.V.
- Design / Supervision
- Shimizu Corporation
- Completion
- Brief Description
- Structure: Steel Structure, Reinforced Concrete Structure
Total Floor Area: 4,350m2 - Location
- Colinas de Leon Industrial Park, Leon, Guanajuato