Dowa Metaltec New Factory
- Guanajuato
- 2017
- Client
- Dowa Metaltec Mexico S.A. de C.V.
- Design / Supervision
- Shimizu Corporation
- Completion
- Brief Description
- Structure:Steel Structure, Reinforced Concrete Structure
Total Floor Area: Phase1 : 4,760m2, - Location
- Castro del Rio Industrial Park, Guanajuato