Shanghai Alibaba Phase Ⅱ Technical Support Project
- 4
- Shanghai
- 2025
- Client
- Chuanxi Technology (Shanghai) Co., Ltd.
- Design / Supervision
- SOM +SIADR
- Completion
- Brief Description
- Contractor:Zhongtian Construction Group Co., Ltd..
Consultant:Shimizu Corporation (China) Limited
Total floor area:77,221.6 m2 - Location
- Shanghai
Awards
Special Achievement Award, The 5th BIM Competition for Engineering Construction Industry
Second Prize (Construction Category), The 13th "Longtu Cup" National BIM Competition





