Inauguration and Inspection of LRT-1 Cavite Extension Project Expanded Depot at Baclaran
DOTr Secretary Art Tugade led the inauguration and inspection of the expanded depot, which added 4.2 hectares to the existing 6.4-hectare Baclaran Depot, allowing for the handling of additional trains and the extension of rail tracks. With the expansion of the Baclaran Depot, 21 stabling and maintenance tracks will be added to the existing 45, increasing the depot's stabling capacity from 130 to 182 Light Rail Vehicles (LRVs) and increasing its heavy and light maintenance capacity from 30 to 48 LRVs.